LIST OF ON-GOING PROJECTS

 

S.N

    CONTRACT NO.

CLIENT REPRESENTATIVE NAME & TEL. #

PROJECT / CONTRACT TITLE AND BRIEF DESCRIPTION OF WORK

LOCATION

1

30841045/00 SEC-ERB

SEC-EAST Mr. A.R. Awdah Tel: 0505926314

Construction & Maintenance of Under Ground Distribution System in Al-Hassa and Abqaiq for voltage up to 35KV. (Overhead Materials supplied by SEC).

Al-Hassa (SEC)

2

20731127/00

ADVANCE ENERGY CO. (AECC)

110KV Overhead Transmission Line Installation Between 110KV Badr Substation and Looping Point of Existing 110KV Overhead Transmission Line Between 110KV Substation Yanbu & Existing Badr.

Badr

3

20731041/00

SEC-WOA

Construction of 110KV DC OHTL from 380/110KV Yanbu SWCC S/S to 110 KV Substation at Badr.

Yanbu

4

10831005/00

SEC-COA

Reconductoring of Existing 132KV Double Circuit OHTL

80058104-8015 for SEC RIYADH.

East Riyadh

5

10831208/00

SEC-COA (Saleh M. Al-Onaizan)

Retrofitting of Existing Overhead Ground Wires (OGW) with Overhead Optical Ground Wires (OPGW) for Qassim Area 132KV Transmission Lines

Qassim

6

30631119/00

SEC-EOA

Replacement ofOld Deteriorated OPGW in SEC-EOA

Dammam/ Safaniyah/ Jubail/ Hawiyah

7

40941101/00

SEC

33KV Construction on OHL @ Population Complex Southern Sector-Abha

Abha

 

8

 

41341014/00

SEC

The Unified Contract for Distribution Networks up to 36kV in Jazan Area.

 Jazan

 

LIST OF COMPLETED PROJECTS.

SN

Contract  No. & Signing Date

Client Name

Project / contract Title and description of work

Status

1

Saudi Aramco/EPC 6600010348

Mr. Saud Al Jaloud

Construction of D.C 230k transmission line line UPG to CGP and extension of 230kV switchyard at UGP. 230kV switchyard extension project portion includes construction of various civil work such as but not limited to: Construction of D.C 230kV transmission line for UGP to CGP

Completed

2

40941101/00

SEC

33KV Construction on OHL @ Population Complex Southern Sector-Abha

Completed

3

Saudi Aramco/EPC 6600010348

Mr. Saud Al Jaloud

Construction of Double Circuit  230Kv transmission line from SGP to CGP and extension of 230KV switchyard at UGP.  230KV switchyard extension project portion includes construction of various civil works such as but not limited to: Construction of D.C 230kV transmission line for SGP to CGP and extension of 230kV switchyard at SGP

Completed

4

SEC-NWR/MASS  Cont # 8/1/23

Mr. Khalid G. Al Solami

Stringing of appr.  160km of 110kV double circuit transmission line conductors and OPGW  from Madinah North s/s to Al Khayber New s/s   The scope of work includes but not limited to:

Completed

5

SEC-EOA/SST # 6554

Mr. Gerard Dhanraj

Splicing & Testing of 12,F, 24F and 36F Fiber optic cables (PTS-1043) Eastern Provice

Completed

6

SEC-SOA/NEC 40131003/00

Mr. Raymond G. Bisnar 

24 Core fiber optc pigtail splicing and testing works at patchpanel at the following substation of saudi elctricity company in southern area operations.

Completed

7

050/98/3100/b2

Al-Abdul Rehman Contracting  Establishment

66kV underground cable project in and around Mananma. Behrain under MEW 66kV undeground cable project in and around Manaman. Behrain under MEW includes the following

Completed

8

SEC-EOA / Siemens 4500460277

Mr. Santosh Bhagwat  Director, 

230kV Power supply to HADEED - II which includes but not limited to :

Completed

9

SEC-EOA / H.H. alzamih Est. Cont.# 1205-848

Mr. Elvin R. Fuselier  Managing

Splicing and Testing of OPGW installed along the following 115kV transmission

Completed

10

SEC-EOA / SSEM Cont # 83820/00

Mohd. Adeeb 

This scope of work consists  of but now limited to stringing of conductor, OGW,OPGW, installation of conductor light/spherical markers as started below:

Completed

230kV D/C OHL Abqaiq Center- Senaeyah
230kV D/C OHL Dhahran Central- Senaeyah

11

SAUDI ARAMCO/NESMA

Mr. Antonie G. Kfouri Dy. General Manager

Design, Procure and install 115kV Transmission Line (Built on wood pole structures) for tempory power supply to khurais facilities.

Completed

12

SEC-EOA/RTCC

Al Rashid Co.  Mr. Wael Bayoumi

Power Supply to LVS-2, Hufuf water transmission line:

Completed

13

AARTCO 05-JRW-405

Mr. John Wood Cock

Excavation of trenches and laying of 66kV cables, Backfilling of cables trenches, Excavation and backfilling of joint pits. In Doha city.

Completed

14

AARTCO 05-JRW-405

Mr. John Wood Cock

66kV underground cable project in and around Manama. Behrain under MEW 66kV underground cable project in and around Manama. Behrain under MEW include:

Completed

15

SAUDI ARAMCO SSEM CONT.# 6600012052

Mr. Alexander J. Elsig

Replacement of obsolete switchgear at various 13.8.kv S/S # 43,57 and 69 at RasTanura Refinery. The Scope of Work includedes but not limited to:

Completed

16

Arrazi/Siemens Cont# 60 OP-00186-P04

Mr. Santosh Bhagwat  Director IPSC

Construction of Concrete Cable Trenches, Culverts and Drain Pits in SABIC Plant in Jubail

Completed

17

SABIC/Tecnimont

Mr. Abdul Wall Khan

Design & Engineering Services, Procument of Materials and undertake civil works for 230kV Power Supply to Share Petrochemical Company The scope of work included but not limited to the following.

Completed

18

SEC-ERC 84138/00 

Mr. Munekhar J.

Construction of Underground & Overhead  line distribution system expansion in N.O.A. Khafji. For voltage up to 15kV. 

Completed

19

SEC-ERB 88194/00

Mr. A. Hameed Mubarak 

Construction & Maintenance of Underground & Overhead distribution System in Al Hassa & Abqaiq for voltage up to 35kV 

Completed

20

SEC-ERB 86298/00

Mr. Ahmed Dubaikhi

Construction of Underground & Overhead  line distribution system expansion in Dammam. For voltage up to 15KV. 

Completed

21

SEC-ERB 86305/00

Mr. Ahmed Dubaikhi

Maintenance of Underground & Overhead  line distribution system expansion in Dammam. For voltage up to 15kV. 

Completed

22

862800/00

Mr. Ahmed Dubaikhi

Maintenance of Underground & Overhead  line distribution system expansion in Dammam. For voltage up to 15kV. 

Completed

 23

SEC-WRB / Dunya Est. Cont. #2045

Mr. Qaiser General Manager 

Stringing of Conductors and Installation of Droppers in 380kV / 110kV Wadi al Fara S/S

Completed

24 

6600019045

Saudi Aramco A.R Al Shalawi Est.

Supply, Construct, Install & Commissioning of 34.5kV Over Head Transmission line work complete with under ground cable rizer, cutouts and construction of access road and duct bank at manifa area for saudi aramco

Completed

 25

30621090/00

SEC-EOA / Arabian Bemco Contracting Co .Ltd.

Construction of Qurayyah Open Cycle Gas Turbine Power Plant for SEC-EOA 34.5kV Double Circuit Overhead Transmission Lines.

Completed

 26

6600017662

Saudi Aramco Mr. Shayban Abdul Hakkeem Pro. Engr.

Upgrade Power & Cooling System of Tower Building Dhahran The work includes Construction of sub station room installation of 13.8kV Switch gear, 2500kV Transformer, MMC, ATS, MTS, 1600kV generators and UPS system. Upgrade cooling system which includes installation of 10'' pipe line and installation of 300 ton chiller  

Completed

  27 

450KPTY PP PDH

Siemens

230kV U/G Cable between 230kV Jubail Southwest and Sahara Substation, PPPDH Sahara - SEC S/S Extension at 230kV Jubail Southest Substation.

Completed

 28

3001138598

Siemens

Upgrade Substation at Najran Bulk Plant.

Completed

 29

6000019296

Saudi Aramco 

Load Shedding Work at RTR, SGP & UGP and Demolition Work

Completed

 30

30541020/00

SEC-ERB

Construction & Maintenance of Overhead Distribution System in Al-Hassa and Abqaiq for Voltage up to 35kV.

Completed

 31

30831211/00

NCC 

Loop-Out Arrange Ghomath 115/13.8kV Substation

Completed

 32

EPCC-OHTL-100

Eastern Province Cement (EPCC) Khursaniyah

Engineering, Procurement, Construction, Testing and Commisioning of 15kV Transmission Line Project for Eastern Province Cement Co.

Completed

 33

40641120/00

SEC-SOUTH (Mr. Ali Misfer)

Survey, Design, Engineering, Procurement, Supply and Deliver to the work site Materials/Equipment, Testing and Commissioning 33kV OHTL for JIZAN

Completed

 34

 40641118/00

SEC-SOUTH (Mr. Ali Misfer)

Survey, Design, Engineering, Procurement, Supply and Deliver to the work site Materials/Equipment, Testing and Commissioning 33kV OHTL for Al-Haqu Villages JIZAN

Completed

35 

6600021510

ARAMCO Mr. Fareed Shaudan

Power Generation & Distribution Reliability Improvement Project to replace existing S/GEAR and MCC. Install piping , Skid and Coalser filters.

Completed